Technical Specifications
- Province
- Koshi
- Location/Affected Area
- Sankhuwasabha
- Power Evacuation Capacity
- 2260 MW
- Voltage
- 400 kV
- Transmission Line Length
- 35 km
- Substations
- Haitar, Sitalpati
- Substation Capacity
- 300 MVA, 630 MVA
- Targeted Completion
- 2087/88
- Tentative Budget Required
- 69.65 MUSD
- Major Hydropower Projects
- Kimathanka Arun (450MW), Upper Arun (1061 MW), Kusuwa Khola (45MW), Chujung Khola(48MW), Lower Barun Khola (55MW), Ikhuwa Khola (40MW)