Lambagar-Barhabise 220 kV Transmission Line Project

Technical Specifications

Province
Bagmati
Location/Affected Area
Dolakha, Sindhupalchowk
Power Evacuation Capacity
1240 MW
Voltage
220 kV
Transmission Line Length
43 km
Substations
Lambagar Substation, Barabishe Bay Extension
Substation Capacity
315 MVA
Targeted Completion
2087/88
Tentative Budget Required
28.78 MUSD
Major Hydropower Projects
Lapche HEP (160MW), Upper Lepche HEP (52MW), Lapche Tamakoshi HEP (22MW), Jhoom HEP (56MW), Rolwaling HEP (88MW)