Technical Specifications
- Province
- Koshi
- Location/Affected Area
- Taplejung
- Power Evacuation Capacity
- 154.35 MW
- Voltage
- 132 kV
- Transmission Line Length
- 20 km
- Substations
- Mewa Substation
- Substation Capacity
- 30 MVA
- Targeted Completion
- 2083/84
- Tentative Budget Required
- 10.3 MUSD
- Major Hydropower Projects
- Upper Mewa A (31.92MW), Palun Khola 1 HEP (30 MW), Union Mewa HEP (23MW), Palun Khola small HEP (21 MW), Sona Khola HEP (9 MW)