Mewa-Change (Dhungesanghu) 132 kV Transmission Line

Technical Specifications

Province
Koshi
Location/Affected Area
Taplejung
Power Evacuation Capacity
154.35 MW
Voltage
132 kV
Transmission Line Length
20 km
Substations
Mewa Substation
Substation Capacity
30 MVA
Targeted Completion
2083/84
Tentative Budget Required
10.3 MUSD
Major Hydropower Projects
Upper Mewa A (31.92MW), Palun Khola 1 HEP (30 MW), Union Mewa HEP (23MW), Palun Khola small HEP (21 MW), Sona Khola HEP (9 MW)