Sanfebagar-Basti-Betan 132kV Transmission Line Project

Technical Specifications

Province
Karnali, Sudur Paschim
Location/Affected Area
Surkhet, Accham
Power Evacuation Capacity
100 MW
Voltage
132 kV
Transmission Line Length
48 km
Substations
Sanfebagar, Betan
Targeted Completion
2087/88
Tentative Budget Required
2.22 MUSD
Major Hydropower Projects
Budi Ganga (20MW)