Technical Specifications
- Province
- Karnali, Sudur Paschim
- Location/Affected Area
- Surkhet, Accham
- Power Evacuation Capacity
- 100 MW
- Voltage
- 132 kV
- Transmission Line Length
- 48 km
- Substations
- Sanfebagar, Betan
- Targeted Completion
- 2087/88
- Tentative Budget Required
- 2.22 MUSD
- Major Hydropower Projects
- Budi Ganga (20MW)