Tamor-Dhungesanghu 220 kV Transmission Line Project

Technical Specifications

Province
Koshi
Location/Affected Area
Taplejung
Power Evacuation Capacity
700 MW
Voltage
220 kV
Transmission Line Length
32 km
Substations
Tamor Substation, Dhungesanghu Bay Extension
Substation Capacity
315 MVA
Targeted Completion
2087/88
Major Hydropower Projects
Ghunsa Khola HEP (77.5MW), Super Tamor (66MW), Simbuwa Khola (70.3MW)