From the CEO’s Desk
प्रसारण शुल्कको नयाँ खाका : एउटै दरको सट्टा तीन तहको मोडल किन आवश्यक ?
२१ असोज २०८३ मा रातोपाटीमा प्रकाशित प्रमुख कार्यकारी अधिकृतज्यूको विचार |
The transmission backbone RPGCL is building to wheel Nepal's hydropower to homes, industry and regional markets.
6,867 km
132 kV, 220 kV & 400 kV transmission corridors planned under Transmission System Master Plan (TSMP) 2040
102
Grid substations and switching stations supporting nationwide power evacuation
30 GVA
Total power transformer rating planned across the transmission system
38 GW
Future generation capacity to be integrated into the national transmission network
18 GW
Projected domestic electricity demand
16 GW
Planned power available for regional electricity markets
2040 TARGET
40 GW
Transmission infrastructure designed to support the movement of large-scale hydropower toward domestic and regional markets.
Currently, 11 numbers of transmission line projects which are at different stages of development
Under Construction
Karnali, Sudur Paschim
Pre-Construction
Koshi
Study & Survey
Rastriya Prasaran Grid Company Limited (RPGCL) was established on 27 Asar 2072 (13 July 2015) under the Companies Act 2063 by the Government of Nepal (GoN) as part of a comprehensive power sector reform initiative. RPGCL is entrusted with the mandate of functioning as an independent Transmission System Operator (TSO) to ensure the development, expansion, operation and management of the country's high-voltage electricity transmission system.
Its establishment is a key milestone under Nepal's power unbundling policy — aimed at enhancing the efficiency, transparency and accountability of the electricity transmission sector.
2015
RPGCL incorporated as Nepal's independent Transmission System Operator.
TODAY
RPGCL incorporated as Nepal's independent Transmission System Operator.
2030
Cross-border links with India & China Scaled up for regional power trade.
2040
Transmission capacity to wheel 40 GW of power nationwide.
Reach the office bearers of Rastriya Prasaran Grid Company Limited directly.
Chairman
Chief Executive Officer
From the CEO’s Desk
२१ असोज २०८३ मा रातोपाटीमा प्रकाशित प्रमुख कार्यकारी अधिकृतज्यूको विचार |
From the CEO’s Desk
१३ जेठ २०८३ मा रातोपाटीमा प्रकाशित प्रमुख कार्यकारी अधिकृतज्यूको अन्तर्वार्ता |
From the CEO’s Desk
ऊर्जा क्षेत्रबारे प्रमुख कार्यकारी अधिकृतज्यूको विशेष संवाद।